Sunday, May 31, 2015

Finish Line in Sight

We are less than a month away from the grand opening of the connector, so a lot of small things are happening to bring it to completion, including flooring, painting, fixtures, etc.

 

The third floor, looking at the new light fixture.

 

A closer look at the new light feature.

 

The elevator is in place but not yet functional.

 

The 3rd-floor entrance into the Life Education Center.

 

The overhead rolling doors leading into the existing foyer come down if there is a fire.

 

The tile on the first floor of the connector.

 

A view from the Nursery & Preschool into the connector.

 

The roof of the new overhang.

 

No comments:

Post a Comment