Perhaps you've seen the plastic from the outside, or you've seen the temporary walls up near the chapel and in the sanctuary foyer. There's work going on both inside and outside right now. On the outside, the concrete floor have been poured. On the inside, walls are being removed and spaces are being reconfigured. Here's a look at what is going on if you missed seeing the pictures in the service this morning.
![]() |
A View from the Parking Lot |
![]() |
Another View from Below |
![]() |
Second Floor of the Connector |
![]() |
The Elevator Shaft |
![]() |
Behind the Plastic on the First Floor |
![]() |
Near the Stairs by the Balcony |
![]() |
Behind the Balcony |
![]() |
Soon to Open Into the Connector |