Going Down Before Going Up

A little more is visible than the last time I wrote. The back foundation wall is built and the rest of the foundation is in progress. The under-foundation plumbing is in place and the foundation for the elevator shaft has been dug down to prepare for our new three-story elevator. Here is what it looks like:

 

The back foundation wall, between the buildings.

 

Trenches dug out for the foundation and the pit for the elevator shaft.

 