Thursday, August 21, 2014

Digging It

The lobby to the sanctuary is about to get a little smaller, at least temporarily. The walls to where the connector will be will be coming down and a temporary wall will be put up, shortening the lobby by several feet. This is so that the ground can be dug out between the buildings for the bottom floor of the connector. The air conditioning units between the buildings are also being moved to allow for the digging.

Here is a look at what's happening:

 

The temporary wall will appear where you see the plastic sheeting.

 

These walls outside the lobby will be removed.

 

This dirt will be dug up to make room for the bottom floor of the connector.

 

All of these units will be moved and the ground below them will be dug up.

 

This is a view of the ground that will be dug up from the lobby.

 